1. Regulation 4 of Technical Airworthiness Management Manual (TAMM) stipulates that the maintenance of state-registered aircraft and its aeronautical product be performed by an organization that has been certified by the Technical Airworthiness Regulator (TAR) as an Approved Maintenance Organization (AMO). In this context, the AMO shall include all service and commercial organizations engaged, or seeking to engage, in the maintenance (service and repair) of Malaysian state-registered aircraft and its aeronautical products.

2. Any commercial organization can submit the application for AMO certification to DGTA provided the following pre-requisites are met:

a. Existence of a design/engineering services contract between the applying organization and the Government of Malaysia.

b. In the absence of the contract, a sponsorship letter from respective State Aircraft Operators (SAO). The sponsorship letter shall define clearly the scope & level of design or engineering activities to be certified.

c. Submission of a draft Maintenance Management Plan (MMP) that conforms to the requirement stipulated in the TAMM. The MMP must define clearly the scope and level of maintenance activities that have been authorized by the SAO.

3. For service organizations applying to be an AMO, the above pre-requisites are also required to be met except for the maintenance contract.

4. For commercial organizations which have already been certified as an AMO by another approved national airworthiness authority, a copy of the approval certificate is required in addition to the pre-requisites mentioned in paragraph 2 above.

5. Once the pre-requisites are met, DGTA will carry out a desktop audit (or adequacy audit) based on the content of the draft MMP. The desktop audit is only completed after the auditors are fully satisfied that the MMP fully comply with the TAMM requirement.

6. On-site compliance audit will be carried out by DGTA auditors when the date of audit has been agreed by both parties. Based on non-conformance findings by the auditors, the auditee is required to take corrective actions within a stipulate timeframe depending on the category of non-conformances. A copy of the audit report will be given to the auditee.

7. A letter of Maintenance Authority (LMA) and AMO certificate will be awarded once DGTA is fully satisfied that the applicant has completed the corrective actions. The AMO certificate will be valid for three years effective from the date of approval.

8. Surveillance audits are carried out on a yearly basis or as and when required by the SAO. The AMO approval can be revoked at any time if the approval holder fails to comply with the TAMM requirement.

 

UPCOMING EVENTS

Perlaksanaan Audit Pematuhan Ke Atas Syarikat Airod - Kuantan...
Perlaksanaan Audit Pemantauan Ke Atas Sekolah Sistem Hawk - Bwth...
Perlaksanaan Audit Pematuhan Ke Atas Syarikat Zetro - Labuan...
Perlaksanaan Audit Pemantauan Ke Atas No. 14 Skn P.U. Labuan...

Galleries

CAMERA ICON

VIDEOS ICON

AUDIO ICON

Our Address:
Directorate General Technical Airworthiness
Aras 8, Menara TH Selborn 
153, Jalan Tun Razak KUALA LUMPUR

Hours of Operation:
Mon. to Fri. 9am to 5pm

General Information

All content and images shown and published on this websites are intended for general information only

Reminder

The Malaysian government and the Directorate General Technical Airworthiness is not responsible for any loss or damage caused by the usage of any information obtained from this portal and can not be construed as agents nor as companies recommended by the Directorate General Technical Airworthiness. Any difficulties should contact the Administrator directly at 03-26873125 or email: This email address is being protected from spambots. You need JavaScript enabled to view it.

Visitors Counter

119108
TodayToday36
YesterdayYesterday172
This_WeekThis_Week629
This_MonthThis_Month4426
All_DaysAll_Days119108